    PNM NMPRC Filings

    Show all

    TXNM Energy - Blackstone Infrastructure Acquisition: PNM NMPRC Application 25-00060-UT

    May 8, 2026: Revised Procedural Schedule

      July 17, 2026 Staff/Intervenor Testimony 
           July 31, 2026 Stipulation Deadline 
      August 5, 2026 Rebuttal Testimony 
      August 13, 2026 Pre-hearing Conference 
      August 17-28, 2026  Hearing

    May 4, 2026: Post-hearing Briefing Order in Show Cause Proceeding

      April 6, 2026: Joint Applicants filing in response to Show Cause Order

      March 17, 2026: Order Setting Public Hearing in Show Cause proceeding and Order Staying Procedural Schedule in acquisition proceeding

      March 11, 2026: Order directing Joint Applicants to Show Cause and Order Scheduling Status Conference for March 16

      February 16, 2026: Supplemental Testimony of Henry Monroy and Heidi Boyd

      February 12, 2026: Order Requiring Amended Pleadings and Extending Deadlines

      February 9, 2026: Order Scheduling Public Comment Hearing

      January 23, 2026: Amended Order Scheduling Public Comment Hearing (correcting address)

      January 21, 2026: Order Scheduling Status Conference

      January 21, 2026: Order Reassigning Co-Hearing Examiner

      January 16, 2026: Procedural Order Establishing Affirmatively Relevant Topics

      January 15, 2026: Order Scheduling Public Comment Hearing

      January 7, 2026: Order Reassigning Co-Hearing Examiner

      October 17, 2025: Order Reassigning Co-Hearing Examiner

      September 16, 2025: Procedural Order

      August 25, 2025: Joint Application

      PNM CCN Application for 345 kV Transmission Project - 26-00041-UT

      PNM Application for Approval Economic Development Projects 25-00088-UT

      Mar. 12, 2026: Order Approving Application

      Jan. 14, 2026: Notice of Errata correcting testimony

      Dec. 29, 2025: Application for Approval of Two Economic Development Projects and Issuance of an Accounting Order Governing the Treatment of Costs Related to Those Projects

      Application and Notice

      Testimony of Adam J. Alvarez

      Testimony of Grant A. Taylor

      PNM CCN Application for 30MW Battery Storage 25-00055-UT

      April 10, 2026: Final Order Approving Application

      August 28, 2025: Procedural Schedule and Errata

      • Nov 7, 2025: Intervention Deadline
      • Nov 14, 2025: Staff/Intervenor Testimony
      • Nov 21, 2025: Rebuttal Testimony 
      • Dec 9, 2025: Hearing (if needed)

      August 26, 2025: PNM CCN Application for 30MW Battery Energy Storage

      Executive Summary

      Application and Customer Notice

      Direct Testimony of Kyle Sanders

      Direct Testimony of Erfan Kakimian

      Direct Testimony of Nicholas Pollman

      Direct Testimony of Gary Barnard pages 1-500 and pages 501-689

      PNM 2025 Rate Request - 24-00089-UT

       
       
      January 10, 2025 Testimony in Support of Unopposed Stipulation
      February 17 - 25, 2025  Hearing
       
       
       
       
      October 15, 2024: Bench Request Order requiring supplemental testimony for clarification
       
      July 11, 2024: Procedural Order

      August 1, 2024 Supplemental Testimony
      October 11, 2024 Intervention and Dispositive Motion Deadline
      November 1, 2024 Required Settlement Conference
      November 26, 2024 Staff/Intervenor Testimony
      November 26, 2024 Stipulation Deadline
      January 17, 2025 Rebuttal Testimony 
       February 10, 2025 Prehearing Conference
       February 17 - March 5, 2025 Hearing

       

      June 14, 2024: PNM 2025 Rate Request Application
       

      PNM 2028 Resource Filing - 24-00271-UT

      May 6, 2025: Certification of Stipulation recommending approval

      March 12, 2025: PNM files Unopposed Comprehensive Stipulation and Motion to File Testimony in Support of Stipulation

      December 20, 2024: Procedural Order

       March 10, 2025

      Deadline for intervention and protest 

       March 17, 2025

      Testimony deadline 

       March 24, 2025

      Rebuttal testimony deadline 

       April 2-4, 2025

      Hearings, if necessary 

       

      November 22, 2024: PNM files 2028 Resource Application for PPAs, ESAs and CCN

      PNM Grid Modernization Application - 22-00058-UT

      October 17, 2024: Final Order approving PNM's application with modifications

      August 16, 2024: Recommended Decision for approval of PNM's application subject to conditions and modifications

      • Exceptions due August 29, 2024
      • Responses to exceptions due September 6, 2024

      January 16, 2024: Procedural Order Supplemental Proceedings:

      • March 1, 2024:      Staff/Intervenor Testimony
      • March 22, 2024:    Rebuttal Testimony
      • April 23-24, 2024:  Hearing

      November 22, 2023: Supplemental Testimony in Support of Cost Benefit Analysis (CBA)

      July 10, 2023: Order Staying Proceedings pending Cost Benefit Analysis

      October 25, 2022: Procedural Order:

      • January 27, 2023:    Intervention Deadline
      • January 27, 2023:    Staff/Intervenor Testimony
      • February 8, 2023:    Rebuttal Testimony
      • February 17, 2023:  Stipulation Deadline, if applicable
      • March 20-23, 2023: Hearing

      October 3, 2022: PNM files Grid Modernization Application

      PNM Application for 2026 Resources (PPAs, ESAs and CCN) - 23-00353-UT

      May 30, 2024: Order approving Recommended Decision as amended

      May 3, 2024: Recommended Decision recommending approval of PPA and ESAs as requested, and requested CCN subject to conditions

      December 7, 2023: Procedural Order:

      • Feb 20, 2023: Intervention/Protest Deadline
      • Feb 23, 2023:          Deadline for Stipulation
      • Feb 23, 2023:        Staff/Intervenor Testimony or Testimony in Support of Stipulation
      • Mar 11, 2023:       Rebuttal Testimony or Testimony in Opposition of Stipulation
      • Mar 20-22, 2024:  Hearing

       

      October 25, 2023: PNM Application for Approval of PPAs, ESAs and CCN for System Resources in 2026

      PNM Wildfire Mitigation Plan - 22-00154-UT

      PNM Resources and AVANGRID Merger: PNM NMPRC Application and NM Supreme Court Appeal  - 20-00222-UT / S-1-SC-39152

      March 18, 2024: New Mexico Supreme Court Decision Overturning Sanction and Annulling and Vacating Final Order (S-1-SC-39152)

      January 22, 2024: New Mexico Supreme Court Order Granting Motions to Withdraw and for Partial Dismissal (S-1-SC-39152)

      January 3, 2024: Notice of Material Event filed with New Mexico Supreme Court Order(S-1-SC-39152)

      July 17, 2023: New Mexico Supreme Court Order rescheduling Oral Argument for Sept. 15, 2023 (S-1-SC-39152)

      May 15, 2023: New Mexico Supreme Court Order Denying Motion to Dismiss and Remand and Scheduling Oral Argument for Sept. 12, 2023 (S-1-SC-39152)

      March 23, 2023: New Mexico Supreme Court Order Granting Motions to Intervene and Deadline for Interventions/Responses (S-1-SC-39152)

      March 8, 2023: Joint Applicants and NMPRC Joint Motion Filed in Appeal with New Mexico Supreme Court (S-1-SC-39152)

      August 5, 2022: Joint Applicants' Reply Brief Filed in Appeal with New Mexico Supreme Court (S-1-SC-39152)

      June 13, 2022: NMPRC and NEE Answer Briefs Filed in Appeal with New Mexico Supreme Court (S-1-SC-39152)

      April 7, 2022: Joint Applicants' Brief in Chief Filed in Appeal with New Mexico Supreme Court (S-1-SC-39152)

      February 2, 2022: Statement of Issues Filed in Appeal with New Mexico Supreme Court (S-1-SC-39152)

      January 3, 2022: Notice of Appeal with New Mexico Supreme Court (S-1-SC-39152)

      December 8, 2021: Order Adopting Certification of Stipulation

      December 3, 2021: Joint Request for Oral Argument

      November 12, 2021: Joint Applicants' Exceptions to the Certification of Stipulation

      November 1, 2021: Hearing Examiner Certification of Stipulation 

      July 29, 2021: Joint Applicants Rebuttal Testimony (incorporating additional commitments to stipulation) 

      June 4, 2021: Amended Stipulation (incorporating MSR and LAC Joinder) 

      May 28, 2021: Procedural Order

      • June 18, 2021 - Testimony in Support of (or do not Oppose) Stipulation
      • July 16, 2021 - Testimony in Opposition of Stipulation
      • July 29, 2021 - Rebuttal Testimony
      • August 3, 2021 - Prehearing Conference
      • August 9, 2021 - Public Comment
      • August 11-20, 2021 - Evidentiary Hearings

      May 20, 2021: Joint Motion for Joinder to Stipulation of Joint Applicants, MSR and LAC

      May 18, 2021: Joint Applicants' Response to Order Regarding Service Quality Issues and Management Audits (exhibits excluded)

      May 11, 2021: Order Regarding Service Quality Issues and Management Audits

      May 7, 2021:Notice of Filing Stipulation 

      April 26, 2021: Order Vacating Prehearing Conference and Procedural Schedule and Providing for Settlement Discussions

      April 23, 2021: Amended Stipulation 

      April 21, 2021: Order Denying Motion to Vacate Deadlines and Order Requiring Statements of Opposition by April 26, 2021

      April 21, 2021: Expedited Motion to Vacate Deadlines and Request for Status Conference 

      April 20, 2021: Initial Stipulation 

      December 18, 2020: Procedural Order

      November 23, 2020: Joint Application for the Approval of the Merger of NM Green Holdings, Inc. with PNM Resources, Inc.; Approval of a General Diversification Plan; and All Other Authorizations and Approvals Required to Consummate and Implement this Transaction

      PNM 2024 Rate Change Filing - 22-00270-UT

      October 25, 2024: PNM Brief in Chief filed with the New Mexico Supreme Court

      June 5, 2024: PNM Statement of Issues filed with the New Mexico Supreme Court

      March 14, 2024: PNM Notice of Appeal filed with New Mexico Supreme Court

      January 29, 2024: PNM Motion for Rehearing on Final Order

      January 3, 2024: Final Order issued by New Mexico Public Regulation Commission

      December 15, 2023: PNM Exceptions to Hearing Examiners Recommended Decision

      December 8, 2023:  Recommended Decision with Appendix A-I and Order Limiting and Shortening Deadline for Exceptions

      September 4, 2023:  Prehearing Order with schedule of expected witnesses

      August 31, 2023:  Notice of Public Comment Hearing

      August 30, 2023:  Extension of Public hearing through September 26, 2023

      August 18, 2023: Unopposed Joint Motion for Prehearing Conference and Variance from Second Procedural Order if Necessary related to settlement filed in connection with San Juan Generating Station Show Cause Proceedings (19-00018-UT and S-1-SC-39440) 

      August 15, 2023:  Order Granting Motion for Second Public Comment

      July 12, 2023:  Voluntary Recusal of Chairman O'Connell

      April 7, 2023:  Second Procedural Order 

      May 12, 2023 Required Settlement Conference (on or before this date)
      June 23, 2023 Settlement Deadline or Staff and Intervenor Testimony Due
      July 28, 2023 Rebuttal Testimony Due
      August 31, 2023 Prehearing Conference
      September 5-22, 2023      Public Hearing

      January 27, 2023:  Voluntary Recusal of Commissioner O'Connell

      January 6, 2023:  Procedural Order

       January 27, 2023              PNM Supplemental Testimony  
       April 6, 2023  Intervention Deadline, Dispositive Motions

      (other items modified on April 7)

         
      December 5, 2022:  PNM 2024 Rate Change Filing 

      PNM CCN Application for 12MW Battery Storage 23-00162-UT

      December 21, 2023: Final Order Adopting Recommended Decision 

      December 8, 2023: Recommended Decision and Order Shortening Deadline for Exceptions

      October 5, 2023: Order Denying Motion to Vacate Hearing

      September 22, 2023: Order Regarding Motion to Vacate Hearing 

      September 19, 2023: Motion to Vacate Hearing 

      May 30, 2023: Procedural Order:

      • Aug 18, 2023: Intervention Deadline
      • Aug 18, 2023:      Staff/Intervenor Testimony
      • Sept. 7, 2023:      Rebuttal Testimony
      • Oct. 12-13, 2023: Hearing, if necessary

       

      May 3, 2023: PNM CCN Application for 12MW Battery Energy Storage

      PNM 2023 Integrated Resource Plan

      For information about the 2023 Integrated Resource plan visit www.pnm.com/2023-IRP

      PNM Petition for Approval of Rate Adjustment Mechanism (Decoupling) - 20-00121-UT / S-1-SC-39401 / S-1-SC-39406

      Consolidated Application for San Juan Generating Station and NM Supreme Court Appeal - 19-00018-UT, 19-00195-UT / S-1-SC-39440

      November 14, 2023: New Mexico Supreme Court order dismissing appeal

      September 21, 2023: New Mexico Public Regulation Commission orders approval of Settlement

      September 14, 2023: New Mexico Supreme Court grants Order remanding matter to NMPRC for further proceeding

      August 28, 2023: PNM filed Reply Brief in appeal with the New Mexico Supreme Court (S-1-SC-39440) while motion for abeyance and remand remains pending

      August 18, 2023: Unopposed Joint Motion for Abeyance and Remand to Implement Settlement and Request for Expedited Order and Unopposed Comprehensive Settlement Agreed filed in appeal with the New Mexico Supreme Court (S-1-SC-39440) and in connection with San Juan Generating Station Show Cause Proceedings (19-00018-UT and S-1-SC-39440) and Related Rate and Prudence Issues in PNM Rate Case Proceedings (22-00270-UT)

      July 27, 2023: NMPRC and Joint Intervenors-Appellees Answer Briefs with the New Mexico Supreme Court (S-1-SC-39440) 

      May 22, 2023: PNM filed Brief-in-Chief in appeal with the New Mexico Supreme Court (S-1-SC-39440) 

      November 1, 2022: New Mexico Supreme Court Order Granting Stay (S-1-SC-39440) 

      September 2, 2022: New Mexico Supreme Court Order Granting Emergency Stay and Briefing (S-1-SC-39440) 

      August 1, 2022: PNM Statement of Issues filed in appeal with New Mexico Supreme Court (S-1-SC-39440) 

      July 25, 2022: PNM Emergency Motion and Brief for Partial Stay filed in appeal with the New Mexico Supreme Court (S-1-SC-39440) 

      July 22, 2022: NMPRC Order Denying PNM Emergency Motion for Stay

      June 30, 2022: PNM Notice of Appeal and Motion for Stay with the New Mexico Supreme Court (S-1-SC-39440) 

      June 29, 2022: Final Order Adopting Recommended Decision with Additions and PNM Emergency Motion for Stay 

      June 17, 2022: Recommended Decision and Procedural Order

      April 20, 2022: PNM Testimony (and Errata filed May 10) and Legal Memorandum in response to Procedural Order

      April 1, 2022: Procedural Order

       April 20, 2022   PNM Testimony
       May 11, 2022   Staff and Intervenor Testimony
      May 18, 2022   Rebuttal Testimony
       May 19, 2022   Public Comment
      May 20, 2022   Prehearing Conference, if needed
      May 23-26, 2022   Evidentiary Hearing

      February 28, 2022: Motion to Show Cause and Enforce Financing Order and Supporting Brief

      July 29, 2020: Order on Recommended Decision on Replacement Resources - Part 2

      June 24, 2020: Hearing Examiner Recommended Decision on Replacement Resources - Part 2

      April 1, 2020: Final Orders issued for Abandonment and Financing Case

      March 27, 2020: Hearing Examiner Recommended Decision on Replacement Resources - Part 1

      March 3, 2020:  Hearing Examiner Errata to the Recommended Decision on Issuance of a Financing Order

      February 21, 2020:  Hearing Examiner Recommended Decisions on Abandonment and Financing Case

        January 29, 2020:  New Mexico Supreme Court Order and Writ of Mandamus Regarding Applicability of Energy Transition Act

        December 9, 2019:  Emergency Verified Petition for Writ of Mandamus Regarding Applicability of Energy Transition Act

        November 6, 2019:  Order Regarding Prehearing Conference and Amending Procedural Order

        October 3, 2019:  New Mexico Supreme Court Order Denying PNM Joint Motion

        October 1, 2019:  New Mexico Supreme Court Order Denying New Energy Economy Amended Joint Filing

        September 18, 2019:  New Energy Economy Amended Joint Filing with New Mexico Supreme Court 

        September 10, 2019:  New Mexico Supreme Court response to New Energy Economy joint filing

        August 30, 2019:  Order Amending Procedural Order and Consolidating Consideration of Proposed Replacement Resources

        August 29, 2019:  PNM Joint Motion with New Mexico Supreme Court regarding applicability of Energy Transition Act

        August 26, 2019:  New Energy Economy Joint Filing with New Mexico Supreme Court regarding constitutionality of Energy Transition Act

        August 23, 2019:  PNM Brief Regarding ETA

        August 23, 2019:  PNM Response to NMPRC Order on Motion to Permit Interlocutory Appeal

        August 21, 2019:  NMPRC Order on Motion to Permit Interlocutory Appeal

        July 12, 2019:  Procedural Order Concerning Consolidated Application for San Juan Generating Station

        July 1, 2019:  Consolidated Application for San Juan Generating Station

        PNM Application for Abandonment of Four Corners Power Plant and Financing Order and NM Supreme Court Appeal - 21-00017-UT / S-1-SC-39138

        July 6, 2023: New Mexico Supreme Court decision upholding NMPRC denial (S-1-SC-39138)

        March 28, 2023: Oral arguments held at the New Mexico Supreme Court (S-1-SC-39138)

        June 17, 2022: PNM Reply Brief in response to Answer Briefs filed in Appeal with New Mexico Supreme Court (S-1-SC-39138)

        May 9, 2022: NMPRC, Sierra Club-CCAE, and NEE Answer Briefs filed in Appeal with New Mexico Supreme Court (S-1-SC-39138)

        March 24, 2022: PNM Brief-in-Chief filed in Appeal with New Mexico Supreme Court (S-1-SC-39138)

        January 21, 2022: Statement of Issues filed in Appeal with New Mexico Supreme Court (S-1-SC-39138)

        December 22, 2021: Notice of Appeal with New Mexico Supreme Court (S-1-SC-39138)

        December 15, 2021: Order Denying Application for Abandonment, Sale and Issuance of a Financing Order

        November 30, 2021: PNM Responses to Exceptions

        November 12, 2021: Hearing Examiner Recommended Decision

        March 19, 2021: Procedural Order 

        • May 17, 2021 - Intervention Deadline 
        • July 12, 2021 - Staff and Intervenor Testimony
        • August 2, 2021 - Rebuttal Testimony and Deadline for Stipulation
        • August 9, 2021 - Stipulation Rebuttal Testimony
        • August 26, 2021 - Prehearing Conference
        • August 30, 2021 - Public Comment
        • August 31 - September 14, 2021 - Public Hearing

        March 15, 2021: Amended Application and Supplemental Testimony 

        February 26, 2021: Order on Sufficiency of PNM's Application and Scope of Issues in Proceeding

        January 8, 2021: Application for the Abandonment of Four Corners Power Plant and Issuance of a Financing Order Pursuant to the Energy Transition Act

        PNM Application for Abandonment of PVNGS Leased Capacity & Procurement of Resources - 21-00083-UT

        February 16, 2022: Order Approving Replacement Resources

        February 14, 2022: Recommended Decision to Approve Replacement Resources

        July 28, 2021: Recommended Decision on Motions to Dismiss

        June 25, 2021: PNM's June 25, 2021 Supplemental Testimony

        May 11, 2021: Revised Procedural Order 

        • June 18, 2021 - Intervention Deadline
        • June 25, 2021 - PNM Supplemental Testimony
        • August 20, 2021 - Staff and Intervenor Testimony
        • September 3, 2021 - Filing of Stipulation (if any)
        • September 30, 2021 - Rebuttal Testimony
        • October 12 - 22, 2021 - Hearings

        April 2, 2021: PNM Application for the Decertification and Abandonment of 114 MW of Leased Palo Verde Nuclear Generating Station Capacity and Sale and Transfer of Related Assets and for Approval to Procure New Resources

        PNM 2020 Integrated Resources Plan

        PNM Advanced Metering Infrastructure Project – 15-00312-UT

        April 11, 2018Final Order

        PNM San Juan Generating Station BART Filing – 13-00390-UT

        March 5, 2018: New Mexico Supreme Court Decision Affirming NMPRC Order

        December 16, 2015: Final Order

        November 16, 2015: Certificate of Stipulation

        August 28, 2015: Testimony in support of Supplemental Stipulation:

        August 13, 2015: Supplemental Stipulation

        Proposed Procedural Schedule:

        • August 28 - Testimony in support of the Supplemental Stipulation due
        • September 25 - Testimony in opposition to the Supplemental Stipulation due
        • October 5 - Rebuttal testimony due
        • October 7 - Prehearing Conference
        • October 13 - Hearing on Supplemental Stipulation begins

        July 1, 2015: Restructuring and Coal Agreements

        June 3, 2015: PNM’s Motion for Extension to File SJGS Restructuring and Fuel Supply Agreements

        May 27, 2015: Order Setting Further Proceedings

        April 20, 2015: Exceptions to Hearing Examiner Recommended Decision
        (certain exceptions containing confidential information, which is available only to parties that have executed confidentiality agreements, have been omitted)

        April 8, 2015: Hearing Examiner Recommended Decision

        October 1, 2014: Settlement Stipulation

        July 15, 2014: Supplemental Testimony:

        July 1, 2014: SJGS Ownership Status Update 

        December 20, 2013: PNM BART Filing

        PNM Rate Case Filing – 16-00276-UT

        January 19, 2018:  Joint Notice by all Signatories of Acceptance of Commission's Modifications to Revised Stipulation

        January 17, 2018:  Order on Notice of Acceptance

        January 16, 2018:  PNM's Notice of Acceptance of Proposed Modifications to Revised Stipulation Subject to a Clarifying Change of the Revised Order

        January 10, 2018:  Revised Order Partially Adopting Certification of Stipulation

        January 3, 2018:  Order Granting Motions for Rehearing

        December 28, 2017:  Motion for Rehearing and Request for Oral Argument

                                            Joint Motion for Rehearing

         December 20, 2017:  Order Partially Adopting Certification of Stipulation

         October 31, 2017:  Hearing Examiners' Certification of Stipulation

         June 2, 2017:  Order Establishing Procedural Schedule

                                   Order Amending Procedural Schedule

         May 23, 2017:  Revised Settlement Stipulation

        May 12-15, 2017:  Joint Motion in Response to Stipulation Order

                                       Stipulation Order

        May 5, 2017:  Stipulation Summary

                                Settlement Stipulation

        April 12, 2017: Order Extending Suspension Period

        January 11, 2017: Procedural Order

        December 14, 2016: Order Suspending Rates

        December 7, 2016:  PNM Rate Case Filing 

        PNM Rate Case Filing - 15-00261-UT